Normand Flower Retrofit

During a dry-dock period in Landskrona, Sweden, we replaced the old ABB AC410 System onboard.

Vessel Information
Build: 2002
Owner: Solstad Offshore ASA
Segment: Offshore - PSV - UT-737


Class: DNV +1A1, SF, E0, DK+, III(2,8), Oil Rec., DYNPOS Autro, HELDK-SH.

During a dry-dock period in Landskrona, Sweden, old ABB AC410 system onboard was replaced with new Høglund Solutions:

  • Power Management System
  • ABB Thruster drive interface& Control
  • GMR Playback
  • Høglund Remote Control, for remote service and support

Old I/O Cabinet with controllers and I/O modules

Old alarm, computers and control panels in ECR desk

I/O Cabinet after upgrade

New operation stations after upgrade

This was a “turn-key” contract. Høglund project and commissioning engineers arranged :

  • Approbation with Factory Acceptance Test together with DNV-GL
  • Cable Pulling
  • Installation, Re-connection and I/O check
  • Harbour Acceptance Test with DNV-GL
  • Sea Acceptance Test with DNV-GL

After the sea-trial Høglund handed over the new system with all approved certificates needed.